Why Thousands Own

Ultimate Versatility

For All Sizes of Road Repair

Small

(A few hundred square feet or less)

Do in 1 to 2 hours what used to take all day.

Medium

(Up to a city block)

Do in a day what used to take a week or two.

Large

(Up to a half mile or more)

Do in a couple of days what used to take weeks.

TESTIMONIALS

  • “Our Asphalt Zippers have enabled us to cement-stabilize 714 miles of our roads over the past 20 years, because we can now do in a day what used to take 2 weeks.”

    – Richie Beyer, P.E.

    Chief Operations Officer
    Elmore County, AL

  • “If we were doing it the old way, it would have taken us years to complete these 22 projects. We probably would have only completed 2 or 3 this year. Where in that same time frame, 7 months, we completed 22 projects with the Zipper.”

    – John “JD” Donnelly

    Public Works Director
    Seguin, TX

  • “We’re saving approximately 70% compared to contracting out. What used to take months we can now do ourselves in about a week, on our own time schedule. We can do more jobs with less money.”

    – Steve Adams

    Township Supervisor
    Damascus, PA

  • “We can do in a couple of hours what used to take several days. We’re able to use the grindings, which also eliminates asphalt disposal costs.”

    – Patrick Zellner

    Street Maint. Manager (retired)
    City of Renton, WA

  • “It’s hard to believe that a process that is faster also lasts longer and even costs less. But that’s exactly what we have found.”

    – Tony Vasquez

    Public Works Division Chief
    Bexar County, TX

  • Muni Draft

    “I’m thoroughly pleased with our Zipper. What it did in half the time we were doing with our large reclaimer is going to really improve our production.”

    – Joe Hamric

    Area Manager
    Polk County, FL

  • “A half mile that used to take us 4 weeks digging out we can now stabilize with our Zipper in 2 days, which saves us a tremendous amount of time and money. The Zipper does an amazing job, and the Accu-Trak™ system couldn’t be easier.”

    – Shane Ramsey

    Assistant Road & Bridge Director
    Pulaski County, AR

  • Muni Draft

    “Lease to own is an economical way to get a pretty considerable piece of equipment and spread the cost over time. It paid for itself in the first year. It’s a home run.”

    – Sean McKee

    Township Manager
    South Heidelburg, PA

  • “It’s very simple, very fast, and really easy and also saves a lot of time and money.”

    – John Miller

    Operations Superintendent
    Glenn County, CA

  • “The Zipper has more than paid for itself. In fact, it paid for itself within the first year.”

    – James Dubois

    Superintendent
    Walsh, CO (pop. 720)

  • We are really pleased. We can now easily do a half a mile in only a day and a half. This would have normally taken us two weeks or longer to excavate, haul off and then haul in new base. Not only is it a lot faster, but it’s also a lot less expensive now that we’re able to convert our worn-out road surfaces into base material and reuse it in place.”

    – Wade Scarbrough

    County Commissioner
    Precinct 1, Archer County, TX

  • “Compared to traditional asphalt road reconstruction methods, Full-Depth Reclamation has numerous engineering, economic, and environmental benefits.”

    – Spencer Guthrie, Ph.D.

    Professor of Pavement and Materials Engineering, Brigham Young University

  • “The Zipper has revolutionized our maintenance program. We now do in a day what used to take 2 weeks or longer.”

    – Wayne Gisler, P.E.

    Road and Bridge Engineer
    Karnes County, TX

  • “The 5-year muni program enabled us to buy an Asphalt Zipper. The Zipper is more productive than we thought, and the savings have far exceeded our annual payment. We couldn’t be happier.”

    – Melvin Lanier

    Road and Bridge Supervisor
    Custer County, ID

  • Muni Draft

    When you can present a finished product that holds up for years and is a good quality product with the least amount of tax-payer money being used, everybody’s happy.

    – Jared Wehry

    Road Master
    Point Township, PA

  • “The Asphalt Zipper makes usable material out of our existing road surfaces. This gives us a really stable base. We’ve had our Zipper 3 years and none of the roads we’ve done have given us any trouble. Our guys can easily do a half mile per day, and they love it.”-

    – Jeff Muegge

    County Commissioner (Former)
    Milam County, TX

  • “The Asphalt Zipper has been especially helpful throughout the COVID-19 pandemic. We’re able to follow through and keep essential projects on schedule with the City of McKeesport’s own staff. Our crews are able to get onto a job site, and get each project done right while saving a considerable amount of money with each and every project. “Covid-19 may have slowed us down, but we’re still ‘Zipping.’ This equipment has been a great benefit to the City of McKeesport, as it gives our Public Works Department the flexibility to respond quickly as conditions change. “We’ve had our Zipper for three years, and our only regret is not purchasing this equipment sooner.”

    – Tom Maglicco

    City Administrator
    City of McKeesport, PA

  • Muni Draft

    “This machine is economical to purchase, and it’s reliable. It does the job of a much larger milling machine. I highly recommend it.”

    -Henry Weid

    Public Works Director
    City of Brownwood, TX

  • “With our Zipper we’re able to do a large patch in just a couple of hours that used to take us all day. It makes a cleaner cut, with a better edge, and it also creates a reusable base material out of our old roads. We love it!”

    – Harry Frisby

    Public Services Superintendent
    City of Inglewood, CA

  • “It used to take 2 guys a full day to do what we do in less than 2 hours with the Zipper.”

    – Mike Stenhouse

    Street Superintendent
    City of Renton, WA

  • “We can mobilize in a matter of days, so we win and our constituents win. Timing has been beautiful. If you don’t have a Zipper, you better get one. Your city will be in a better position.”

    -Pete Beltran

    Council Member
    City of Alice, TX

  • Muni Draft

    “We used to do 1.5 Miles a year of road repairs paying a contractor. Now that we own an Asphalt Zipper, we can do 8 miles of repairs a year with the same budget.”

    – Ryan Herzog

    Supervisor
    Keating Township, PA

  • “We’re able to use the material that’s already there, in many cases that’s all we need. In fact a road we Zipped 7 years ago that services 42 active oil wells is still solid.”

    – Tommy Durrett

    Road Superintendent
    Claiborne Parish, LA

  • Muni Draft

    If you have potholes, if you have streets that are decaying and chipping away, this is the machine for you.

    -Terry Coffee

    City Manager
    City of Panhandle, TX

  • “The good thing about it is every time I use it I know I am saving money. If you’re not Zipping, you are wasting money.”

    – Jerry Haynie

    Road Manager (retired)
    Lafayette County, MS

  • Muni Draft

    “We love our Asphalt Zipper, it’s been a game changer for our City.”

    – David Mills

    Transportation Manager
    City of the Dalles, OR

  • Muni Draft

    “The material came out like spec rock…extremely impressed, there’s limitless applications for this machines. It takes all the work out of it.”

    – Tom White

    Road Foreman
    County of Walla Walla, WA

    What’s Next