Only 14 cents

per square foot on average

Asphalt Removal

Cut a straight edge and pulverize asphalt into reusable material

HOW IT WORKS

VIRTUALLY ELIMINATES

  • Saw-cutting
  • Chunking
  • Trucking
  • Asphalt Disposal
https://asphaltzipper.com/c/wp-content/uploads/2023/07/produces-spec-comparable-material.jpg

PRODUCES
SPEC-COMPARABLE
MATERIAL

  • Recycled asphalt can be reused as back-fill or bedding. 
  • Open only what you need, when you need it. 
  • “Zipped” trench can be driven over immediately.
https://asphaltzipper.com/c/wp-content/uploads/2024/06/image-24.png

CREATES A STRAIGHT EDGE WITH BETTER BONDING

University research has proven that a scarified, interlocking “Zipped” edge improves joint bond strength 25 percent over a saw-cut edge.”

W. Spencer Guthrie, PhD, Dennis L. Egget, PhD, Keith
H. Woffinden, EIT, “Effect of Scarification on Asphalt Patch Joint Strength,”
Transportation Research Board Annual Meeting, 2005.

bret lane

“The Zipper makes a great edge, giving us a stronger, more permanent asphalt repair.”

President, Laser Underground & Earthworks, Inc. Bellevue, WA

– BRET LANE

great-for-tcuts

NEW GEN-8 MACHINES ARE IDEAL FOR:

  • T-Cuts
  • Trench Plate Recessing

COMPARISON – 400 FT TRENCH

Save an Average of $1,000 every 100 Feet of Utility Trench

By “Zipping” instead of saw-cutting, chunking, loading, hauling, disposal, and backfill, a 400-foot trench that would typically take a day or longer can be opened in about 30 minutes, with approximate cost savings of $4,000, based on national averages of Asphalt Zipper owners. (Save roughly $10,000 for every 1,000 feet of utility trench you open.)

$1 Million SAVINGS

Every 100 hours of use

on average

 

New GEN-8 Machines

UP TO 9X THE PRODUCTION

COMPARED TO PREVIOUS MODELS

“The jump from our old machine to our newer one is 15 times faster. You have to put the loader in second gear because first gear is too slow. That’s how fast this machine wants to eat asphalt.”

CEO
Pacific West Underground, CA

– David Durenberger

SPEED & PRODUCTION

https://asphaltzipper.com/c/wp-content/uploads/2023/07/DEH_7829_AuroraHDR2019-license-plate-number-obscured-CMYK.jpg

EASY TO USE

EASY TO MOBILIZE
(ON OPTIONAL CUSTOM TRAILER)

Asphalt Zipper® custom trailers are the easiest way to transport from site to site behind most work trucks. Plus, with an on-board custom tool box you’ll always have everything you need for operation and routine maintenance in one secure place.

  • Custom inset for a lower center of gravity (standard models)
  • Convenient working deck for routine maintenance
  • Transport behind most work trucks
https://asphaltzipper.com/c/wp-content/uploads/2023/07/360X-200H-on-trailer-CMYK.jpg

EASY TO LOAD/UNLOAD

The Asphalt Zipper® is easy to load and unload from its custom trailer. Mounts securely to the widest variety of loaders or backhoes in just minutes.

https://asphaltzipper.com/c/wp-content/uploads/2023/07/Bit-Hatch-DEH_3271-CMYK.jpg

EASY TO MAINTAIN

Top-opening hatch (hydraulic on larger models) simplifies bit inspection and replacement.

TESTIMONIALS

  • “We milled the road with the Zipper for 15 minutes and the crews are already working and putting pipe in the ground. It makes our prices more competitive because we can put pipe in the ground faster.”

    -Frank Pellicano

    Project Manager
    Persistent Construction, NJ

  • “The Zipper has probably made more money for the cost than any other purchase in the almost 20 years I’ve been in this business.”

    -Tim Smith

    Vice President
    Dallas 1 Construction, FL

  • “When you are faced with 10-12 inches, I would have never believed it had I not seen it. It was pretty amazing.”

    – Rick Mancha

    General Superintendent
    Pacific West Underground, CA

  • “We just bought our third Zipper. We bought our first in 1998, and it paid for itself many times over. Even though we’ve loved our older Zippers, our crews noticed immediately how the newest machines have been dramatically improved.”

    – Bret Lane

    President
    Laser Underground & Earthworks, WA

  • “Using the Asphalt Zipper has made our job much easier. It is great having this caliber of a machine on site. It gives us an advantage.”

    Ronnie and Donnie Burns

    Owners
    R&D Burns Bros., TX

  • “I love Zipper. Plenty of power. We can recess our plates in about one quarter of the time that it takes with our planers.”

    – Fred Neal

    Superintendent
    Orion Construction, CA

  • “I bought the Asphalt Zipper to be able to provide my team with the best asphalt removal product I had ever seen. I’ve been in the industry for 15 years, and I’ve never seen anything else that so efficiently mills a trench.”

    – Nick Jacob

    Owner
    Ajax Northwest, OR

  • “We have 11 Asphalt Zippers and use them all every day. The newest Tier 4 model has been awesome, the guys love it. It’s a beautiful design with significantly more power, and the DEF system has worked flawlessly.”

    -Pat Digney

    Foreman
    Gray Supply Corp., NJ

  • “It has more power, greater production, easier on my loader, I like the onboard water. Great improvements, I’m very happy with it, very happy.”

    -Perry Thomas

    Owner
    Perry C. Thomas Contracting, CA

  • “We can easily pulverize a 10,000 square foot parking lot by mid-morning and have it graded and ready to pave by mid-afternoon.”

    -Jay Armstrong

    President
    Armstrong Paving, Canada

  • “The Zipper is a must have if you’re a utility contractor. I can’t imagine doing utility work without one.”

    – Jason Danks

    Operations Manager
    Orion Construction, CA

    ARE YOU READY?

    More Info / Where to Buy